The plan is to disconnect SuNNs and connect dummy cable B in roughly 1 month time (somewhat depending on the shutter delivery and SuNNs alignment progress). This ticket is to document:
1. What data we want/need to take
2. Estimate needed observation time for this data and our total observation time requirments
3. Establish how many times we would need intervention by Julien, i.e., trip to the summit
- relates to
-
PIPE2D-556 Visualize separation of possible dummy cable B fibers
-
- Done
-
-
PIPE2D-789 Reduce data described in PIPE2D-788
-
- Done
-