Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-126

Change number of emission lines held back to percentage

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Done (View Workflow)
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Story Points:
      0.5

      Description

      Currently the number of emission lines held back from the fitting procedure for the check is hard coded to 8. Please replace this with a percentage determined by a config parameter.

        Attachments

          Activity

            People

            • Assignee:
              price price
              Reporter:
              aritter aritter
            • Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: