-
Type: Story
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: None
-
Labels:
-
Epic Link:
-
Sprint:EDR+AIT
EDR2 will include engineering data from Nov 2022 and Apr 2023. We do not put as much QA efforts as we did in EDR1, but still a minimal level of QA is needed. This ticket is a link to the minimal QAs. As there are still a lot of issues to work on, we changed our minds to make a full release document to summarize all our knowledge at the time of the release.
- relates to
-
PIPE2D-1250 detectorMap QA for EDR2
- Done
-
PIPE2D-1251 flux calibration QA for EDR2
- Done
-
PIPE2D-1313 extraction QA for engineering data release 2
- Done
-
PIPE2D-1341 flux calibration QA for EDR2: take 2
- Done