Similar to PIPE2D-1140, reduce the data obtained in 2023 Apr commissioning run.
The list of calibration data taken may be found in PIPE2D-1187
A complete set of visits to be reduced are:
run12 (Jul 2023): https://sumire.pbworks.com/w/page/153934425/Science%20Data%20from%20Run%2012
run11 (Apr 2023): https://sumire.pbworks.com/w/page/153263325/Science%20Data%20from%20Run%2011
run08 (Nov 2022): https://docs.google.com/document/d/1qfZV55DYlx9t7ru6dKntg3CiJj2HF3McBwJ2DZUrCWk/edit
- relates to
-
PIPE2D-1241 Reduce data obtained in Apr 2023 run on tiger
- Done
-
PIPE2D-1140 Reduce data obtained in Nov run for the internal release to the collaboration