Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1148

Flux calibration performance check using Nov run data

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None

      Description

      We check the flux calibration performance using the commissioning data in November. We use three visits of a CALSPEC standard star (CALSPEC_5057499 = 82905, 82906) and a DA star (DA_288 = 83162), as well as F stars in the other raster scan data. Specifically, we calibrate the CALSPEC and DA stars from PFS using the F-stars in the same field of view and compare their spectra with those from the CALSPEC archive.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                takuji.yamashita Takuji Yamashita
                Reporter:
                takuji.yamashita Takuji Yamashita
                Reviewers:
                Kiyoto Yabe
              • Votes:
                0 Vote for this issue
                Watchers:
                5 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: