-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: obs_pfs
-
Labels:None
-
Story Points:1
CCDs don't have correct gain values, I'll replaced them with the ones calculated at JHU.
But those might be re-estimated later.
- relates to
-
PIPE2D-1158 Regenerate CALIBs following SM3 gain correction
- Done
-
PIPE2D-1160 Validate and install gain-corrected CALIB
- Done
-
INSTRM-1840 measure sm1/sm3 CCDs gain
- Done