-
Type:
Task
-
Status: Done (View Workflow)
-
Priority:
Normal
-
Resolution: Done
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: None
-
Labels:
-
Story Points:2
-
Sprint:preEngRun07Sep
Prepare a target list of standard stars for the September 2022 Eng Run. The target list is composed of faint DA white dwarf standards and CalSpec stars as well as the last runs.
- relates to
-
PIPE2D-1108 Standard stars for November 2022 engineering run
-
- Done
-
-
PIPE2D-1022 Plan for flux calibration test of May-June 2022 runs
-
- Done
-