Uploaded image for project: 'DRP 2-D Pipeline'
  1. DRP 2-D Pipeline
  2. PIPE2D-1075

Standard stars for September 2022 engineering run

    XMLWordPrintable

    Details

    • Story Points:
      2
    • Sprint:
      preEngRun07Sep

      Description

      Prepare a target list of standard stars for the September 2022 Eng Run. The target list is composed of faint DA white dwarf standards and CalSpec stars as well as the last runs. 

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                takuji.yamashita Takuji Yamashita
                Reporter:
                takuji.yamashita Takuji Yamashita
              • Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: