-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: ets_target_database
-
Labels:
-
Epic Link:
As Eric-san installed Gaia DR3 in the Subaru system, we would like to move from DR2 to DR3 in the scripts used for generating pfsDesign files during the commissioning run in June 2022.