-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: tron_actorcore
-
Labels:
-
Story Points:1
-
Sprint:SM1PD-2019 E, SM1PD-2020 A, SM1PD-2020 C, SM1PD-2020 D
In operation, the iicActor requests visits from the gen2Actor and distributes them to lower-level actors. The iicActor will be the only one which does this.
For engineering, low-level actors (ccdActor, mcsActor, hxActor, spsActor, spsaitActor, etc) need to be able to get their own visits. A single mechanism should be shared by all. Probably in tron_actorcore.
- blocks
-
INSTRM-778 Post-delivery, pre-operations SM1 changes at Subaru.
- Done