-
Type: Story
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: spt_operational_database
-
Labels:None
-
Story Points:1
This is an umbrella ticket to capture updates made by Yabe-san to the operational database schema during Oct 2019 to Dec 2019. While these are tracked in separate tickets, all the changes were made in a single branch to aid discussions. These will be merged from that single branch to master.
- relates to
-
INSTRM-844 Additional updates to operational schema
- Done