-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: ics_roughActor
-
Labels:
-
Story Points:1
-
Sprint:SM1PD-2019 A, SM1PD-2019 B, SM1PD-2019 C, SM1PD-2019 D
LAM does not run the same roughing pump that JHU and Subaru do, so they do not run the ics_roughActor.
We need to run an instance at Subaru, presumably on the host running in the 5th rack. We will need the address of the MOXA (or other RS-485/RS-232) registered.
- is blocked by
-
INSTRM-818 Install roughing MOXA rack unit
- Done
- relates to
-
INSTRM-806 Provision rack5-ics host
- Done
-
INSTRM-778 Post-delivery, pre-operations SM1 changes at Subaru.
- Done