Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-718

Pre-shipping procedures for SM1

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Component/s: None
    • Labels:
    • Story Points:
      2
    • Sprint:
      SM1-2019 L, SM1-2019 M, SM1-2019 N, SM1-2019 O, SM1-2019 P

      Description

      Following today's ICS/DRP+SpS telecon: Fabrice will put together a set of procedures that should be followed to ensure that the SM1 software is acceptable before shipping.

        Attachments

          Activity

            People

            • Assignee:
              fmadec fmadec
              Reporter:
              hassan hassan
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: