-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: ics_enuActor
-
Labels:
-
Story Points:1
-
Sprint:SM1-2019 J
As there is a shutdown routine for the slit, I need to add a startup routine which
- power on hexapod controller
- init without homingĀ
That will be the nominal way to operate the slit at the summit.