-
Type: Task
-
Status: Won't Fix (View Workflow)
-
Priority: Normal
-
Resolution: Won't Fix
-
Component/s: None
To recap various formal and non-formal conversations, here is the data set we would like taken after each instrument reconfiguration, cool down, or disassembly. And once a month in any case.
In order:
- 15 biases
- 15 300s darks
- dithered flats, currently 20 roughly 0.3 pixel steps on each side of nominal. Three exposures at each position.
- 5 flats at nominal position.
- 5 Ne arcs, with peaks at 40k or so
- 5 HgAr arcs peaks at 40k or so
- any other arc lamps, 5 exposures with peaks at 40k