Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-445

Provide 10TB disk at Subaru for MCS testing

    XMLWordPrintable

    Details

      Description

      As discussed during the PFS Servers and Infrastructure WG meeting 2018-07-25, a request by cloomis for a 10TB disk for installing the minimum software and data for the MCS testing in September 2018 needs to be made available.

      Ideally this should be available by 2018-09-01 to allow Craig to install the necessary data.

        Attachments

          Activity

            People

            • Assignee:
              hiro Yoshida, Hiroshige
              Reporter:
              hassan hassan
            • Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

              • Due:
                Created:
                Updated:
                Resolved: