We had to thermal cycle for the telescope maintenance (power panel upgrade work) late April. Check FPA focus and update xcu.yaml if needed.
Measured positions are as follows:
xcu_b1 motors moveCcd a=144.11 b=123.51 c=98.02 microns abs
xcu_b2 motors moveCcd a=218.95 b=229.08 c=219.80 microns abs
xcu_b3 motors moveCcd a=179.97 b=163.19 c=179.38 microns abs
xcu_b4 motors moveCcd a=110.23 b=73.24 c=124.67 microns abs
xcu_r1 motors moveCcd a=157.26 b=143.16 c=118.74 microns abs
xcu_r2 motors moveCcd a=154.91 b=177.78 c=156.43 microns abs
xcu_r3 motors moveCcd a=195.05 b=183.58 c=183.16 microns abs
xcu_r4 motors moveCcd a=97.29 b=43.97 c=90.85 microns abs
The motor (focus) positions changed by up to ~10um. As Image quality (spot size) of engineering fibers is the same as before with the above position, Use the new position.
Note: n arm show the similar spot size.