Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-2133

allow drifts using engineering fibers

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Open (View Workflow)
    • Priority: Normal
    • Resolution: Unresolved
    • Component/s: None
    • Labels:
    • Sprint:
      EDR+AIT, PreEngRun15Mar

      Description

      After looking at the distribution of available fiber bundles, we know that we need to take drift flats with the engineering fibers. I gave that a try with `iic drift --iisHalogen ....`. That seemed to need a change to one of the `sps` -> `enu` commands (`iic halogen` -> `iic prepare halogen`). The lamps then behaved, but the `slit linearVerticalMove` command was not being sent and I ran out of time to look further.

        Attachments

          Activity

            People

            • Assignee:
              arnaud.lefur arnaud.lefur
              Reporter:
              cloomis cloomis
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated: