Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-2066

Adjust power-on mask for PCMs

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Component/s: None
    • Labels:

      Description

      The PCMs have a mask of which ports to automatically power up when the PCM is turned on. As shipped from IDG, that is engineering- or checkout- oriented: onlybthe BEE is powered up.

      Once a cryostat is checked out, that should be flipped: most/all ports should be enabled by default. In particular, once a cryostat has been checkout out at Subaru, that mask should be changed.

      Do so as they get delivered.

        Attachments

          Activity

            People

            • Assignee:
              cloomis cloomis
              Reporter:
              cloomis cloomis
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: