-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: None
-
Labels:
The PCMs have a mask of which ports to automatically power up when the PCM is turned on. As shipped from IDG, that is engineering- or checkout- oriented: onlybthe BEE is powered up.
Once a cryostat is checked out, that should be flipped: most/all ports should be enabled by default. In particular, once a cryostat has been checkout out at Subaru, that mask should be changed.
Do so as they get delivered.
- relates to
-
INSTRM-2236 Add fee to default PCM power mask
- Done