Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1858

Punch List for Run 10 (February 2023)

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Component/s: None
    • Labels:
    • Sprint:
      PreEngRun10Feb

      Description

      Here is a test and check list for software updates prior to Engineering Run 10 (2023/02/17-20).

      Note that all the software should be tagged and implemented at the summit/Hilo system, except for the open branch of agccActor which will be updated after the test with MELCO.

      • AG  configuration INSTRM-1784 , INSTRM-1860
        • Run agccActor on Yoshida's simulator (Yoshida, Yan)
      • AG scale fitting INSTRM-1862
        • Run ag Actor from iic and see option works correctly (Le Fur, Yoshida)
      • Cobra convergence
      • groupID
        • Check if Gen2 commands groups dithering data (Koshida, Takagi, INSTRM-1720)
      • FITS
        • Check if all required headers (see INSTRM-1444) are correctly populated (Loomis, FITS committee?)
      • pfsConfig
      • Confirm CALIB (Siddiqui, LeFur, Price, PIPE2D-1158)
      • Make sure SpS/MCS/AGCC can take data.

        Attachments

          Activity

            People

            • Assignee:
              Unassigned
              Reporter:
              hassan hassan
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: