-
Type:
Task
-
Status: Done (View Workflow)
-
Priority:
Normal
-
Resolution: Done
-
Component/s: None
-
Labels:
-
Sprint:2DDRP-2023 A
Here is a test and check list for software updates before coming the engineering run (2022/11/14-20). Note that all the software should be tagged and implemented at the summit/Hilo system.
- AG name (
DAMD-138,INSTRM-1764)
-
- Take AG camera frame and check the name (Yan)
- XML file
- Check bits of masked cobras in modified xml file (Yan)
- Generate PfsDesign with new bit flags (Onodera)
- RHL PFS scheme
- Document
INSTRM-1765(Lupton)
- Document
- opDB grouping
- Test with 2+ frames with the same groupId (Le Fur)
- opDB schema integrity
- guidestars objId – test by loading PfsDesign/config (Onodera or Yabe)
- population by ASIAA – test by MCS frame (Karr)
- SM1+SM3 operation
- Can SM1 be operated independently of SM3 and concurrently (Le Fur, Loomis)
- Optical Crosstalk
- Regenerate coefficients (Le Fur, Price)
- Fix bug on one side of detector
PIPE2D-1100(Lupton) - Test? (Price)
- OBJECT card contents
- Look at the contents as data are taken (Loomis)
- DRP CALIB (Note: SuNSS cannot be used for SM3)
- SM3 DCB data – detectorMaps (b+r), fiberProfiles (Siddiqui)
After POpt2 installed (i.e. the beginning of the run), the following items can be tested:
- Cobra convergence
- Raster scan
- Full Boresight calculation (check population of the DB)
- Check population of agc_data flags column (Karr)