Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1503

Testing dot-crossing algorithm on PFI test stand

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Component/s: None
    • Labels:
    • Story Points:
      4
    • Sprint:
      PreEngRun05 B, PreEngRun05 C

      Description

      The dot-roach algorithm is important to placing cobra behind the dot. We need to test this algorithm on test bench before going to telescope.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                chyan chyan
                Reporter:
                chyan chyan
                Reviewers:
                hassan
              • Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: