Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1487

Investigate occasional prepare command timeouts

    XMLWordPrintable

    Details

      Description

      During the 2021-11 engineering run, we saw failures when configuring for the flat lamps. When the pfilamps pi computer comes back online, look at the pi-end log files.

      2021-11-22 16:02:06.019Z  new cmd: prepare halogen=10
      2021-11-22 16:02:09.061Z  new cmd: waitForReadySignal
      2021-11-22 16:02:10.114Z  > 2 93 f text="lamps are not configured"
      

        Attachments

          Activity

            People

            • Assignee:
              cloomis cloomis
              Reporter:
              cloomis cloomis
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: