-
Type: Sub-task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: ics_actorkeys
-
Labels:
-
Sprint:PreEngRun05 B, PreEngRun05 C, PreEngRun05 D, PreEngRun05 E, PreEngRun05 F, preEngRun07Sep
The performance of sep (the wrapper for sextractor) produced some unexpect results during the engineering run, with very poor performance in some frames. This needs to be investigated further, and better input parameters determined.