Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1400

Implement boresight measurement routines

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Component/s: None
    • Labels:
    • Story Points:
      2
    • Sprint:
      EngRun3Cleanup

      Description

      Implement code to measure boresight based on Sept engineering run data.

      The boresight measurement should be written to the opDB.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                karr karr
                Reporter:
                hassan hassan
              • Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: