Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1399

Track poorly performing cobras

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done (View Workflow)
    • Priority: Normal
    • Resolution: Done
    • Component/s: None
    • Labels:
    • Story Points:
      2
    • Sprint:
      PreEngRun4, EngRun3Cleanup

      Description

      Please analyse data acquired during the Sept engineering run to determine those cobras that are poorly performing.

      Please also provide the criteria for which this is based.

        Attachments

          Activity

            People

            • Assignee:
              karr karr
              Reporter:
              hassan hassan
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: