Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1222

Feedback to the next persistence test plan based on the previous test data

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Open (View Workflow)
    • Priority: Normal
    • Resolution: Unresolved
    • Component/s: None
    • Labels:

      Description

      The PFS N1 H4RG array shows the very strong persistence. In order to characterize the persistence properties, the test data was taken in 2020 Sep. and 2020 Dec. The analysis of these test data is ongoing. The next test should be planned based on the results of the analysis.

        Attachments

          Activity

            People

            • Assignee:
              shamano Satoshi Hamano
              Reporter:
              shamano Satoshi Hamano
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated: