Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1206

Adapt to iic startExposures finishing quickly

    XMLWordPrintable

    Details

    • Story Points:
      4

      Description

      INSTRM-1193 changes the way very long running IIC sequences like startExposures run. Basically, the command finishes once resources have been allocated instead of finishing after all exposures have been taken, in the indeterminate future. You track the progress of the exposure sequence using keywords.

      The sunssActor currently pretends it is commanding a new-style sequence, by having the command time out after 5s or so. Update the logic to do it correctly.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                cloomis cloomis
                Reporter:
                cloomis cloomis
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated: