Uploaded image for project: 'Instrument control development'
  1. Instrument control development
  2. INSTRM-1145

Replication test for opDB using two test nodes in Hilo

    XMLWordPrintable

    Details

      Description

      Before we make a replication from the summit opDB down to Hilo, we are going to test a configuration by using two nodes in Hilo. After this test is passed, we hope to switch to a real replication between the summit and Hilo.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                furu Hisanori Furusawa
                Reporter:
                kiyoto.yabe Kiyoto Yabe
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: