-
Type: Task
-
Status: Done (View Workflow)
-
Priority: Normal
-
Resolution: Done
-
Component/s: None
-
Labels:
-
Sprint:PreEngRun15Mar, Engrun15Mar
This is splitting off the host configuration work for INSTRM-2146, based on recent conversations between Kiyoto Yabe and Hisanori Furusawa
We want both pfsa-usr03 and the cluster head node to be configured in the same way:
- mounting /software and /data (only /data/raw is needed) readonly from the summit.
- mounting the same /work (read-write) as is used by usr01
- wth the same tunnel access as we have between usr01 and mhs-ics for the MHS control and status connections.
- relates to
-
INFRA-329 Configure the Hilo cluster node to run drpActor
- Done
-
INSTRM-2146 Move drpActor in Hilo to dedicated node.
- Done